SERVICE.


Interior is the soul of architecture, the connection between human and environment, and the combination of human art and material civilization.


We adhere to the design concept of continuous exploration, people-oriented, improve the sense of experience of space, tailor-made, and are committed to providing professional service providers for design, soft decoration, whole house customized product R & D and manufacturing.






SERVICE PROCESS





1、The owner makes an appointment with the customer manager to meet and negotiate with the designer, carry out preliminary design consultation and communication, and understand the design style, color preferences, resident structure, living habits, and the overall budget investment.
2、The owner and the designer determine the design intention, and the owner entrusts the designer to conduct on-site survey of the required design house after paying the deposit of the measuring room. Both parties exchange design requirements and ideas on site.
3、According to the design demand template provided by the customer, the design team starts to carry out the scheme design, after making a proposal on the plane planning, style orientation and soft decoration positioning, it is agreed that the owner will communicate the scheme, the owner will sign the design power of attorney after determining the scheme, and pay the design fee according to the contract cost, and then the special team in charge of the project will complete the detailed scheme drawings and soft decoration scheme.
4、Note: make up 50% on the day of signing the design contract, and determine to make up the remaining 50% of the design fee at the su/ effect drawing stage< Br> (this clause is only applicable to customers who construct in our company, and customers who only have design needs need to pay all design fees at one time.)

    DESIGN DRAWINGS

    1. Positioning and handover of water and electricity and wall in design drawings, and assistance in positioning and position verification of water and electricity, socket, pipe position and strong and weak current box (once on site)

    2. The cabinet frame and ceiling frame shall be checked on site from the technical handover of carpenter's mobilization drawings and Mason's mobilization drawings to the woodwork construction stage(once on site)


    3. After the completion of woodwork construction, go to the site to check whether the objects are constructed and fabricated according to the drawings before leaving the site (once on site)

    4. During the plastering construction stage, check the wall and floor tile paving site until the completion of the plastering construction, and check whether the objects are constructed and manufactured according to the drawings before leaving the site (once on site)

    5. The disclosure of paint mobilization process and color matching shall be carried out until the completion of paint construction. Before leaving the site, check whether the process is constructed according to the drawings (once on site)

    6. Furniture, wall and floor tiles, floors, doors, cabinets, lamps and lanterns, curtains, cloth art, sanitary ware, accessories, green plants to assist in the purchase (once on site)

    7. Installation of lamps and lanterns, finished furniture and display of soft decoration (once on site)

    8. The above post tracking service once = half a working day. Drawing disclosure and construction technical guidance tracking service, with a total attendance of 4 times; The furniture, main materials and soft decoration shall be purchased with assistance, and the total number of attendance is 1; The total attendance of the installation part is once; The total attendance of furniture and soft decoration display is 1. Double entry, stairs, cast-in-situ, positioning of water and electricity pipelines in the early stage, positioning of central air conditioning, etc. of the villa shall be appropriately increased according to the actual situation.

    9. If the on-site materials are not in place, the construction personnel are not in place, and the construction party is replaced in the later tracking service, and the service items need to be present again, the charge will be increased by 500 yuan / time. Since the design work requires a lot of time for conception and operation, when the designer's service is required, the owner must notify the designer at least 3 days in advance, so that the designer can reasonably arrange time to serve the owner.

    10. The owner invites a professional construction team or decoration company, and the project manager or full-time supervisor must organize the construction. No matter who the owner asks for construction, the FF design team will follow up the whole process. If the owner invites a non professional construction team or casual decoration workers to construct, the problems caused by wrong rework, unauthorized design modification, rough quality, dirty and messy construction site, delay in construction period and so on have nothing to do with feifu design team. In addition to the residential projects under the overall trust of the whole project design, the important main materials are purchased by the owners themselves.

    PROJECT CONSTRUCTION

    The owner can choose DY ARCHITECTURE construction according to his own needs. Most of the cases done by DY ARCHITECTURE are mainly in modern and minimalist style. In terms of the cooperation of many processes and types of work, the construction time is relatively long and the complexity is high. DY ARCHITECTURE has a fixed construction party, and the tacit understanding between design and construction is also running in very well. For the presentation of the works, the actual living DY ARCHITECTURE and even a good reputation, DY ARCHITECTURE's own construction is also one of the guarantees of quality. Please trust and understand it.

    1. The construction contract is a lump sum contract.


    2. In order to successfully realize the design scheme, DY ARCHITECTURE does not have the form of construction subcontracting, but a specially assigned person directly manages the construction team.

    3. After signing the decoration contract, the owner shall pay 30% of the total construction price as the first installment before construction mobilization; 35% of the total construction price shall be paid as the second phase payment after the hydropower project is accepted and before the carpenter and Mason enter the site; 30% of the total construction price shall be paid as the third installment after the woodworking and plastering works are accepted and before the paint enters the site; After the completion of hard installation and painting, the final payment of the project shall be settled during the installation of main materials, i.e. 5% of the total construction price.

    4. After signing the decoration contract, if the owner who chooses the construction part requests to terminate the construction contract or the contract cannot be continued due to his own reasons, the owner shall timely notify DY ARCHITECTURE to go through the contract termination procedures and pay DY ARCHITECTURE the project payment for the completed project.

    5. DY ARCHITECTURE construction shall provide the brand and model list of construction materials and construction budget details. DY ARCHITECTURE provides one-year free construction service.

    6. One set of water and electricity completion photos (electronic version) shall be provided for DY ARCHITECTURE construction.

    7. Construction is an optional item attached to the design content. Our construction team exists to better serve the design, so we will not accept orders without design and no eDY ARCHITECTUREect. At the same time, the design fee will remain unchanged according to the charging standard.

    8. For projects outside Changsha Outer Ring Road, 5% of the total amount of the project will be charged for remote service, and the travel expenses, board and lodging of foreign projects will be borne by Party A.